
Build
#272 Designing Dinorwig: Inside Electric Mountain
In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in

In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in

Anglian Water has revealed plans for the second of two proposed 5sqkm reservoirs. The reservoir, which will be located in The Fens in Cambridgeshire, is